Arup and Atkins have been appointed by BMB in a joint venture as part of the team charged with delivering the West section of the Thames Tideway Tunnel.
Valued at £416 million, the six kilometre ‘West’ section of the 25km Thames Tideway Tunnel will run from Acton in West London to Wandsworth in South West London incorporating seven separate work sites along the route. Works will include design, construction, commissioning and maintenance following construction completion.
The Arup Atkins joint venture will provide BMB (a joint venture between BAM Nuttall, Morgan Sindall and Balfour Beatty) with a range of design and engineering services.